Figures last updated 20 Oct 2026, 10:01 PM IST · How we work · Report an error
Figures last updated 20 Oct 2026, 10:01 PM IST · How we work · Report an error
What the company does and where it sits in its industry
Core4 Engineers Limited is an EPCC company providing infrastructure solutions across railway, power transmission and distribution, and water/wastewater treatment domains, complemented by in-house electrical panel and compact substation manufacturing.
Core4 Engineers Limited is an Engineering, Procurement, Construction and Commissioning (EPCC) company providing integrated infrastructure solutions across multiple domains, primarily focused on railway infrastructure, power transmission and distribution, and water and wastewater treatment sectors. The company's capabilities span the entire project lifecycle, including design, engineering, procurement, erection, testing, commissioning, and operation and maintenance (O&M).
In addition to EPCC services, the company operates an in-house manufacturing facility in Mysore, Karnataka, for the assembly and testing of High-Tension (HT) and Low-Tension (LT) electrical panels, control and relay panels, and compact substations. These manufactured products serve both internal EPC project execution and external supply to third-party clients.
The company earns revenue from two primary streams: service revenue generated from EPCC contracts across railways, water/wastewater, and electrical infrastructure projects; and product revenue generated through its subsidiary, Core4 Energy Private Limited, from the manufacturing and sale of electrical panels and compact substations. Its customers comprise government departments, public sector undertakings (PSUs), state utilities, and private infrastructure contractors.
The company provides EPCC turnkey solutions for railway electrification and station infrastructure, extra high tension transmission and distribution systems, water and wastewater treatment plants (STPs, WTPs, ETPs), automation and SCADA systems, and manufactures HT/LT distribution panels and compact substations.
The company operates an integrated infrastructure execution and equipment manufacturing model, securing contracts through competitive bidding and subcontracting arrangements while fabricating key electrical distribution assets in-house.
The company operates as an electrical-infrastructure and EPC-focused player with a growing presence across water treatment and railway infrastructure works in India.
Who controls the company, and how much of it they hold
Agrahara Chamaraje Gowda Abhinandan, Hosahalli Appagigowda Savitha, Mahadevappa Tejus, Anala
Points to weigh, drawn from the offer document and the figures on the other tabs
The company operates across multiple infrastructure verticals, including railway electrification, EHV transmission, water and wastewater treatment, automation and SCADA, and in-house panel manufacturing across various states.
In-house manufacturing of HT and LT electrical panels and compact substations allows the company to reduce dependence on external vendors, control project timelines, and improve margin management.
The company performs all eight type tests approved by the Central Power Research Institute (CPRI) on its manufactured products to meet IEC 61439 standards and ensure high field reliability.
The company integrates IoT-based monitoring, SCADA platforms, and advanced automation tools into its project design and execution workflows.
The leadership team and promoters possess extensive engineering and operational experience in infrastructure, railways, power distribution, and corporate governance.
Revenue from private-sector customers grew to 67.66% in FY26 and 88.59% in Q1 FY27, exposing the company to cyclical private capex spending and working capital strain from delays in client payments.
Water and wastewater treatment EPCC projects accounted for 67.65% of service revenue in FY26 and 87.07% in Q1 FY27, where the company has a limited operating history at this scale compared to prior years.
Operations are heavily concentrated in Karnataka, which contributed 85.65% of revenue in FY26 and 95.01% in Q1 FY27, making financial performance vulnerable to local regulatory, economic, and political developments.
The company reported negative net cash flows from operating activities of ₹13.36 crore in FY24, ₹8.59 crore in FY25, ₹10.81 crore in FY26, and ₹8.32 crore in the three months ended June 30, 2026.
Two railway projects awarded by Southern Railway were terminated prior to completion, resulting in pending arbitral claims aggregating ₹1,858.43 lakhs filed by the company and its joint venture.