Upcoming IPOs in India
IPOs that have announced their dates, soonest first, and every company that has filed a DRHP with SEBI or an exchange and is waiting to announce them. A value we do not hold says so.
- IPOs with dates
- 2
- Filed a DRHP, no dates yet
- 406
- Approval received
- 179
- Latest filing
- 16 Nov 2026
- Opens next
- Mahanadi Coalfields · 19 Nov 2026
IPOs with announced dates
Opening soon or about to open, each with its own page for GMP, subscription and allotment.
Filed a DRHP, waiting for dates
406 companies: IPOs of ours with no opening date first, then the newest filing first. Filed means the regulator has the document; approval received means it has cleared it and the company can announce dates.
406 companies · newest DRHP firstPage 3 of 9
Read from public filings twice a day. A filing does not mean the IPO will happen: a company may wait, withdraw or let its approval lapse.
Follow these IPOs
Before you apply
The basics, in plain words.
About upcoming IPOs
Which IPOs are upcoming in India?
2 IPOs are announced and not yet open: Mahanadi Coalfields (19 Nov 2026) and Watrana Rentals (19 Nov 2026). Each IPO's page shows its dates, price band and lot size as soon as they are announced.
Which IPO opens next?
Mahanadi Coalfields Mainboard IPO opens next, on 19 Nov 2026, with a price band of ₹129 – ₹136 per share.
Which upcoming IPOs have a GMP today?
Mahanadi Coalfields ₹3.65 (+2.68%) and Watrana Rentals ₹25 (+10.20%). GMP is an unofficial grey market indicator and changes quickly; the GMP page of each IPO shows its history.
How many companies have filed a DRHP and are waiting to launch an IPO?
406 companies are on the list below the dated IPOs: 179 with approval received and 227 filed and awaiting approval (235 Mainboard, 171 SME). The newest filing on the list is dated 16 Nov 2026. The list is read twice a day.
What is a DRHP, and what does approval received mean?
A DRHP (draft red herring prospectus) is the offer document a company files before it can launch an IPO: with SEBI for a Mainboard issue, and with the exchange (NSE Emerge or BSE SME) for an SME issue. Filed means the regulator has the document and has not cleared it yet. Approval received means SEBI or the exchange has cleared it, so the company can announce IPO dates; it does not have to do so straight away.
How long does an approval last, and why do some companies disappear from the list?
An approval is generally valid for twelve months, and the company must open its IPO within that time or file again. A company leaves the list when its IPO dates are announced (it moves to the dated list above), or when its offer document is withdrawn, returned or its approval has expired.
When does an IPO appear in the dated list?
When its dates are announced, usually a few days before bidding opens. Until then a company that has filed a DRHP stays on the list of companies waiting for dates. Values we do not hold say "Not available yet" and are filled in as they are announced.
What is the difference between an upcoming Mainboard IPO and an upcoming SME IPO?
A Mainboard IPO lists on the main boards of the NSE and BSE and retail bids start at one lot of up to ₹2 lakh. An SME IPO lists on NSE Emerge or BSE SME, is a smaller issue, and its minimum application is larger. The board is shown for every company, and the SME IPOs have their own list.